About the MUST-Autonics PCB

MUST-Autonics is an open source PCB design by MDU-C2, published on GitHub. It is a 2-layer board measuring 183 × 130 mm, with 66 components from 24 distinct parts.

Other key parts include the NUCLEO64-F476RG, PCF8574AN and CJMCU_MCP2551. By type, the board carries 20 resistors, 15 switches, 7 transistors, 7 connectors, 7 diodes and 3 ICs.

MUST-Autonics, from the project README
From the project README

Main components on the MUST-Autonics

NUCLEO64-F476RGPCF8574ANCJMCU_MCP2551

MUST-Autonics bill of materials (BOM)

66 components, 24 distinct parts.

QtyPartRefs
1
NUCLEO64-F476RG
U101
1
PCF8574AN
U201
1
CJMCU_MCP2551
U601
1
2N3904
Q201
6
IPD50R380CE
Q301, Q302, Q303, Q304, Q305, Q306
3
Conn_01x04
J301, J302, J303
3
Conn_01x02
J501, J502, J601
1
DB37_Male_MountingHoles
J701
1
WC1602A
DS201
1
10k
RV201
4
R_POT
RV401, RV402, RV701, RV702
1
SW_DIP_x01
SW201
5
SW_Push
SW401, SW402, SW403, SW404, SW407
7
SW_SPST
SW405, SW406, SW501, SW502, SW701, SW702, SW703
1
SW_DPDT_x2
SW408
1
SW_DIP_x08
SW704
7
LED
D201, D401, D402, D403, D404, D405, D701
1
100n
C201
1
1k
R201
6
10k
R202, R203, R204, R301, R302, R303
Show 4 more
QtyPartRefs
3
4.7
R205, R206, R207
1
100k
R304
8
R_Small
R305, R306, R401, R402, R403, R404, R405, R701
1
120
R601

MUST-Autonics design files

The KiCad project lives in the MDU-C2/MUST-Autonics repository on GitHub; these links point at the commit this page was built from.

MUST-Autonics: common questions

How big is the MUST-Autonics PCB?

The MUST-Autonics measures 183 × 130 mm, has 2 copper layers and is 1.6 mm thick.

How many components are on the MUST-Autonics?

66 components, from 24 distinct parts. The full bill of materials is listed on this page.

Where can I download the MUST-Autonics design files?

From the MDU-C2/MUST-Autonics repository on GitHub, which has the KiCad layout; the links under Design files point to each one.

Can I use the MUST-Autonics design in my own project?

The repository has no license, so all rights stay with MDU-C2. Use it as a reference, and ask the author before reusing the design.